Case Study
Accelerating Project Delivery with Fine-Tuned Cost Control Processes
About
A prominent real estate developer in Southern Europe, this company has spent two decades building an impressive portfolio of marinas, retail destinations, luxury hotels, and residential and commercial properties. Their latest undertaking, a massive urban regeneration megaproject, is poised to become a world-class cultural and economic hub, creating over 80,000 jobs and contributing significantly to the national GDP.
Industry
Infrastructure
Company size
1,000+
Headquarters
Southeast Europe
Challenges
The scale and scope of this megaproject introduced unique challenges, including:
- Resource Constraints: Limited resourcing across cost engineering and contract management teams created concerns about efficiency and workload management.
- Legacy Systems Transition: The need to integrate new project management software with existing ERP systems required seamless data alignment and functionality.
- Tailored Cost Controls: The corporate finance system needed additional capabilities to meet the specific requirements of this complex project.
- Timely Reporting: Accurate and timely reporting was essential for decision-making and stakeholder communication, but existing workflows were labor-intensive and prone to delays.
Solution
The company sought a project control solution that would:
- Simplify cost control management with minimal IT setup.
- Integrate seamlessly with existing systems like ERP.
- Expedite reporting with customizable templates and dashboards.
- Enhance collaboration and decision-making through real-time project visibility.
- Reduce reliance on Excel spreadsheets for data verification and re-entry.
The team chose an automated project management platform that provided out-of-the-box functionality, robust reporting features, and integrated data management to streamline workflows and deliver results efficiently.
Results
lthough the project is still underway, the company has already achieved several key benefits:
- Faster Launch: The project launched quickly, enabling earlier access to performance and progress data for proactive adjustments.
- Streamlined Operations: Reduced time spent on data re-entry and verification allowed the team to focus on deeper, strategic analyses.
- Improved Visibility: Real-time dashboards and reports improved stakeholder communication and provided actionable insights.
- Enhanced Collaboration: The team’s agility and decision-making have improved, with smoother approval cycles and better resource allocation.
- Optimized Resources: With reduced reliance on spreadsheets and improved data accuracy, the company is well-positioned to deliver the project on schedule and within budget.
Download Case Study
“Throughout the planning and project execution, Contruent provided significant value in integrating cost, schedule and progress data, as well as managing change and producing various customer-specific forms and reports.”